Key Points

In a kitchen or hall bath, Foundational replaces fixtures and finishes and leaves the layout alone.
In a kitchen, Elevated allows minor layout changes, such as opening a non-load-bearing wall, removing a soffit, or moving an appliance.
Premier is where load-bearing walls, windows, and doors can move.

We price every remodel at one of 3 levels: Foundational, Elevated, and Premier. If you’ve seen those words on our pricing pages and can’t tell which one matches the project in your head, this is how to sort it out.

You’ll learn:

  • What each level changes, including when an engineer comes in
  • How to tell which level fits your project
  • Where each level starts, room by room
  • When the price is set

What Is the Difference Between a Foundational, Elevated, and Premier Remodel?

The difference is how much of the space changes. Foundational is a facelift: we remove what’s there and replace it with newer fixtures and designs. Elevated makes the room work better, with minor layout changes and premium materials. With Premier, we change the complete layout.

Every service we offer uses these level names, though a hall bath only has Foundational and Elevated. What each level includes changes from room to room.


What Does a Foundational Remodel Update, and What Does It Leave Alone?

In a kitchen or hall bath, a Foundational remodel updates what you see and leaves the layout where it is.

In a hall bath, that means a new tub base, tile walls with a shower niche, and an upgraded vanity and countertop in quartz or stone. A primary bath or whole home can still include minor layout changes.

In a kitchen, it means Level 2 cabinets (Level 2 is the cabinet grade), quartz or granite countertops, a tile backsplash, and under-cabinet lighting. But nothing moves, including appliances.


What Does an Elevated Remodel Change?

In a kitchen or hall bath, Elevated is where the layout starts to move, in small ways.

In a hall bath, that can mean a tub-to-shower conversion, plumbing relocation, or turning a linen closet into a vanity cabinet. An Elevated hall bath takes 4 to 5 weeks, the same as a Foundational one.

In a kitchen, Elevated means Level 3 cabinets, appliance relocation, and minor structural work, like opening a non-load-bearing wall or removing a soffit. Removing a soffit is a major job, and we try to do it anywhere we can. An Elevated kitchen takes 10 to 12 weeks.

In a basement, Elevated adds a dedicated mini-split for heating and cooling, plus a dry bar.

Double sink bathroom vanity with gray cabinets, white stone top, brass faucets, framed mirrors, and sconces

Our master bathroom remodel in Mullica Hill is an Elevated project. So is our primary bathroom remodel in Woolwich.


What Can a Premier Remodel Do That the Other Levels Can’t?

Premier is the level for changing the complete layout. In a kitchen, load-bearing walls can come out, and windows and doors can move.

In our kitchen remodel in Mantua, we had an engineer look at a load-bearing beam so a column could come out and the kitchen could open up.

Kitchen range under a curved wood hood with white cabinets, brass pulls, and sink in Mantua

Not every project needs an engineer or an architect. When we move a load-bearing wall or make another structural change that needs one, we bring one in.

Structural work needs a permit, and so can moving plumbing or electrical at Elevated. New Jersey requires a construction permit for work on existing buildings, including structural, plumbing, mechanical, and electrical work.

A Premier kitchen has custom cabinets and millwork with premium materials, and it takes 12 to 16 weeks.

A Premier primary bath adds structural changes and heated flooring, and it takes 8 to 10 weeks.


How Can You Tell Which Level Fits Your Project?

It’s based on a conversation about your expectations and the investment range you’re willing to spend. We talk through what you want the space to become and how much you want to invest, and we settle the level together. Our tier lists give you a rough idea of where a project sits:

  • In a kitchen, if the layout stays and the appliances stay put, that’s Foundational.
  • In a kitchen, if an appliance moves, a non-load-bearing wall opens, or a soffit comes out, that’s Elevated.
  • In a kitchen, if a load-bearing wall, a window, or a door has to move, that’s Premier.
  • In a hall bath, a tub-to-shower conversion or moving plumbing makes it Elevated. There’s no Premier hall bath.
  • In a primary bath, Foundational can already include minor layout changes, and Premier adds structural changes and heated flooring.

A Foundational and an Elevated kitchen both use quartz or granite countertops.

What Does Each Level Start At, Room by Room?

ProjectFoundationalElevatedPremier
Hall bath$40,000$50,000Not offered
Primary bath$55,000$70,000$85,000
Kitchen$60,000$90,000$120,000
Basement$55,000$75,000$95,000
Whole home$150,000$225,000$300,000
Home addition, per square foot$250$350$450

These are starting prices. You can see the kitchen numbers on our kitchen remodeling pricing page.


How Is the Level Chosen, and When Is the Price Set?

We settle the level with you by talking through your expectations and your investment range.

The price takes longer. You can’t really price anything without a plan, and any number before design is a guess. We start with a scan of your space and 2D layouts, then propose an investment range for those layouts.

If the budget, design direction, and layout look like a good fit, we move into project development, which has a small fee. That’s where the plans and selections get finalized.

At the end of it, we deliver the renderings and the final total investment. You aren’t locked into the build agreement until then.


Is Your Project a Facelift or a New Floor Plan?

Foundational is the facelift, Premier is a new floor plan, and Elevated sits between them.

If you’re still not sure which level fits, schedule a conversation, and we’ll talk through your project. You can also read how our remodeling design process works before you call.

author avatar
Taylor Olson

Frequently Asked Questions

Can I move up a level after the project starts?

The easiest time is before you sign the build agreement. Project development is where we work out the layout and selections, and you aren't locked into the build agreement until it's done. Changes can still happen once construction starts, and when they do, the price goes up with them.

Is the starting price the final price?

No. A starting price is the low end of a level. The final total investment comes at the end of project development, once the plans and selections are done.

Do home additions have levels too?

Yes. Additions use the same 3 levels, priced by the square foot at $250, $350, and $450. An addition follows the same process as every other project, plus an architectural design step.