If your family needs more room, the first question is usually what an addition costs.
You’ll learn:
- What our addition tiers start at per square foot
- What makes one addition cost more than another
- When an engineer or an architect gets involved
- Why a firm total comes after the design
- What one attic-to-suite conversion in Audubon cost
What Does a Home Addition Cost per Square Foot?
We price home additions by the square foot, in 3 tiers. These are where prices start. Your total comes after design:
| Tier | Addition starts at | Addition timeline |
|---|---|---|
| Foundational | $250 per square foot | 4 to 5 months |
| Elevated | $350 per square foot | 6 months or more |
| Premier | $450 per square foot | 9 months or more |
Say you want a small bedroom and bath addition with upgraded materials. That sits at the low end. A large in-law suite, or a multi-room, multi-level addition, sits at the top.
What Makes One Addition Cost More Than Another?

Size comes first. After that, it matters whether the new space goes on top of your existing house or out next to it. Then there is site work, plus the utilities and mechanicals the new space needs, like heating, cooling, plumbing, and electrical.
Licensed plumbers and electricians handle the plumbing and electrical work, and we work with the same trade partners project after project.
In New Jersey, an addition needs a construction permit from your town’s construction office, according to the New Jersey Department of Community Affairs. When a project needs permits, we file for them.
When Does an Addition Need an Architect or an Engineer?
When we are moving walls that are load-bearing, or making other structural changes, we bring in an engineer or an architect. Not every addition needs one. We work out in design whether your house needs one before we give you a total.
What Does an Attic-to-Suite Conversion Cost in Audubon?

In Audubon, we turned an unused attic into a full primary suite for $132,554.93, and it took 9 weeks. The homeowners needed more room. You can see the whole project on our attic-to-primary-suite conversion in Audubon page.

The suite has a mini-split system, a curbless wet room with a tub and a shower, a custom day bed, and spray-in insulation.
In design, we worked out the first layouts, chose materials, walked the space with our trade partners, and delivered 3D renderings.

On this job, we finished space that was already inside the house, with no change to the exterior framing, so it is not a ground-up addition. It does show what a full primary suite cost on one of our jobs.
Can You Get a Real Price Before the Design Is Done?

Not a firm one. You can’t really price anything without a design or a plan in place, and anything else is a guess.
So we work in this order:
- A first conversation to see whether we provide what you need and it looks like we’re a good fit.
- A visit to your home, where we scan the space with an iPad, turn it into a 2D layout, and give you an investment range.
- Project development, which has a small fee. We finalize selections, put the finishes into the plans, and deliver renderings and the final total investment at the end.
- A fixed-price build agreement, with confirmed start and completion dates.
The aim of project development is to cut down on change orders, timeline delays, and unmet expectations.
Is an Addition the Right Move for Your House?
If you are still weighing a remodel against an addition, our post on whether to remodel or add on is a good place to start. When you are ready to talk about the room you want to add, we’d be glad to come out and see your house.