Primary Bathroom Remodel · Pennsville, NJ
Primary Bathroom Remodel in Pennsville, NJ
The Primary Bath That Didn't Match
Everything in this Pennsville home had been remodeled when the homeowner bought it, except for the primary bath. The shower was small, a full wall closed off the room, and the finishes didn’t match the rest of the house. She reached out to our team to bring it up to the same standard.
Pennsville, NJ
8 Weeks
$110,000
170 Sq Ft
“The transformation was amazing and beyond my expectations. Ryan led an outstanding group of professionals who took pride in their work, paid attention to the smallest details, and wanted everything done to complete satisfaction. A bathroom renovation is a big investment, and having a team you can trust makes all the difference. Ryan, Brendon, CJ and the crew were hardworking, punctual, courteous, and dedicated to delivering high-quality results. They didn’t just renovate a bathroom; they transformed the space into something truly beautiful.”
Client Must Haves
A Tub Inside the Shower
The freestanding tub sits inside the wet room, sharing the space with the shower. It’s a layout you don’t see in most bathrooms, and it gives the room a spa feel.
Neutral Color Palette
Cabinetry, countertops and finishes stay neutral, so the stone and her plants stand out.
Full-Height Cabinets Where the Closets Used to Be
Storage was her top request. 3 full-height pantry-style cabinets now line the back wall where the old closets stood.
Daylight From Above and Behind the Tub
A new skylight over the wet room pours light down onto the tub and shower. We kept the window as well, with a privacy film so no one can see in while the daylight still comes through.
More Project Features
Half Wall With Built-In Niche
The old full-height wall came down to a half wall with a niche, which opened up the room.
Natural Stone Tile Throughout
The wet room called for a lot of tile, and she picked natural stone to give the bathroom an outdoor feel.
Towel Warmer by the Wet Room
A wall-mounted towel warmer sits steps from the tub and shower, so a warm towel is waiting when she steps out.
Laundry Behind a Cabinet Door
A full-height cabinet at the back of the room hides her washer and dryer.
Double Vanity
The double vanity has 2 sinks set under one long counter, with drawers and cabinets below for everyday storage.
Chandelier Over the Tub
A crystal chandelier hangs above the freestanding tub inside the wet room.
01
Before.
The room felt closed in. The shower was small and there was no tub. A full-height wall cut the room in half, and the back of the bathroom was taken up by closets.
02
What we saw.
The problem was the layout, not the size. The full wall closed off the room, and the closets didn’t give her the storage she wanted most.
03
What we proposed.
Same footprint, new room. The full wall became a half wall with a built-in niche. The small shower grew into a wet room with a freestanding tub, and full-height cabinets replaced the closets.
04
What we designed.
Over 4 months of design, we revised her 3D renderings 3 or 4 times before construction started. That let her see her options for cabinets, plumbing finishes, countertops, flooring and tile.
05
What they live in now.
Now the room feels open. Light carries over the half wall, the tub and shower share one wet room, and storage fills the back wall. Natural stone, neutral colors and her plants give it the calm, outdoor feel she asked for.
The Room That Finally Matches the Rest of the House
The primary bath was the last room in her home that didn’t fit, and now it does. She has a wet room with a tub and shower, plus the wall of storage she asked for from the start. Even the laundry hides behind a cabinet door. It’s a quiet room to start the day in.
Design Questions Homeowners Ask Us
Most of our clients ask some version of these. If yours isn’t here, call or book a discovery call, we’re happy to talk before you’re ready.
Can I have a window in my shower?
You can, and this bathroom is a good example. The window has a privacy film, so no one can see in, but it still lets daylight into the shower.
What if I can't make up my mind on selections?
That’s what the design phase is for. Not every homeowner decides quickly. We work through what you like and what you don’t, and we update your 3D renderings so you can see each option. Changes during design happen on paper, before anything is built. Once the build agreement is signed, any change becomes a written change order with the cost and schedule impact spelled out first.
How long does a primary bathroom remodel take?
Most primary baths take 5 to 8 weeks of construction. A Premier primary bath with structural changes runs 8 to 10 weeks. This project took 8 weeks, plus about 4 months of design. We confirm your start and completion dates during the project development phase, before any construction starts.
Do you work in my town?
We’re a South Jersey design-build firm based in Mullica Hill. Most of our work is in Gloucester County, including Mullica Hill, Woolwich Township, Swedesboro, Mantua and Sewell, but this project was in Pennsville. Call us and we’ll tell you whether your project fits our schedule.